Tin Footbridge-Central Span Replacement

Published: 10/26/2024

The Authority wishes to award a contract for Tin Footbridge - Central Span Replacement. The works include;- - Existing Structure to be removed. - Contractor to Design & Build: - New Box Culvert Structure to new alignment to improve water flow and widen the road over the beck. - Widen areas of existing road - Build a new wall using existing stone and stone from NYC stock - Rebuild parapets using existing stone and stone from NYC stock - Build a new training wall from NYC stone stock